MOQ: | 900kg |
Price: | Negotiation |
Standard Packaging: | 25kg Carton+900kg/Pallet |
Delivery Period: | 30days |
Payment Method: | L/C, T/T, Q/A |
Supply Capacity: | 200TON/MONTH |
Product | Name | Rubber Ball |
Material | Silicone,NBR, PUR, FKM, HNBR, CR, SBR, EPDM, NR, ACM, PVC, FFKM etc | |
Material Report | FDA, ROHS, UL, WRAS and REACH | |
Supplying Capacity | One Million Pieces/ Month | |
Tolerance | Generally±0.05mm or Better | |
Applications | Transportation, Medical, Oil, Gas & Industrial,auto parts,household,etc | |
Size | Standard Sizes or As per customers' Requirement | |
Certificaton | ISO9001 | |
Color | Any colors according to PANTONE or RAL | |
Surface Finish | Texture (vdi/mt Standard, or Made to Client's Sample), Polished (high Polish, Mirror Polish), Smooth, Painting, Powder Coating, Printing, Electroplating Etc. | |
Service | Custom Made or OEM and ODM | |
Production Ways | CAD Drawing, 3D Files or Samples | |
Shape | All Shapes As Per Drawing | |
Hardness | 20~90 Shore A,Usually 30~80 Shore A | |
Delivery time | 15 Days for Molding, 15-20 Days for Series Production | |
MOQ | 500 Pieces | |
Temperature | -40ºC~+230ºC | |
Free Sample | Yes | |
Package | As Your Request | |
Market | Europe, America,Oceania | |
QC | PPAP, In House Control, Third Party Inspection Institution such as SGS, TUV | |
Mold | Molding Process | Compression Rubber Molding,Transfer Rubber Molding, Injection Molding, Extrusion Mold |
Mould Type | Processing Mold, Injection Mold, Extrusion Mold | |
Machines | 200T,300T and 500T Compressing Molding, Injection Molding, Auto Vacuum Vulcanizing, Plastic Injection, and Extrusion | |
Tooling Equipment | Rubber Tension Tester, Rubber Vulcanization Instrument, Durometer, Calipers, Ageing Oven | |
Cavity | 1~400 Cavities | |
Mould Life | 300,000~1,00,000 Times | |
Production | Production Capacity | Finish Each Mold of Product in 2.5 Minutes and Working on 2 Shafts with 24 Hours |
Mold Lead Time | 10~30 Days | |
Sample Lead Time | 3~5 Days | |
Production Time | Usually 10~30 Days | |
Loading Port | Qingdao Port | |
More Parts |
Grommet, sleeve, feet, gasket, wheel, bellow, cap, dust cover, pad, washer, Strip, plug, stopper, grip, seal, bushing, bumper, blocks, and anti vibration mounts etc. |
FAQ
MOQ: | 900kg |
Price: | Negotiation |
Standard Packaging: | 25kg Carton+900kg/Pallet |
Delivery Period: | 30days |
Payment Method: | L/C, T/T, Q/A |
Supply Capacity: | 200TON/MONTH |
Product | Name | Rubber Ball |
Material | Silicone,NBR, PUR, FKM, HNBR, CR, SBR, EPDM, NR, ACM, PVC, FFKM etc | |
Material Report | FDA, ROHS, UL, WRAS and REACH | |
Supplying Capacity | One Million Pieces/ Month | |
Tolerance | Generally±0.05mm or Better | |
Applications | Transportation, Medical, Oil, Gas & Industrial,auto parts,household,etc | |
Size | Standard Sizes or As per customers' Requirement | |
Certificaton | ISO9001 | |
Color | Any colors according to PANTONE or RAL | |
Surface Finish | Texture (vdi/mt Standard, or Made to Client's Sample), Polished (high Polish, Mirror Polish), Smooth, Painting, Powder Coating, Printing, Electroplating Etc. | |
Service | Custom Made or OEM and ODM | |
Production Ways | CAD Drawing, 3D Files or Samples | |
Shape | All Shapes As Per Drawing | |
Hardness | 20~90 Shore A,Usually 30~80 Shore A | |
Delivery time | 15 Days for Molding, 15-20 Days for Series Production | |
MOQ | 500 Pieces | |
Temperature | -40ºC~+230ºC | |
Free Sample | Yes | |
Package | As Your Request | |
Market | Europe, America,Oceania | |
QC | PPAP, In House Control, Third Party Inspection Institution such as SGS, TUV | |
Mold | Molding Process | Compression Rubber Molding,Transfer Rubber Molding, Injection Molding, Extrusion Mold |
Mould Type | Processing Mold, Injection Mold, Extrusion Mold | |
Machines | 200T,300T and 500T Compressing Molding, Injection Molding, Auto Vacuum Vulcanizing, Plastic Injection, and Extrusion | |
Tooling Equipment | Rubber Tension Tester, Rubber Vulcanization Instrument, Durometer, Calipers, Ageing Oven | |
Cavity | 1~400 Cavities | |
Mould Life | 300,000~1,00,000 Times | |
Production | Production Capacity | Finish Each Mold of Product in 2.5 Minutes and Working on 2 Shafts with 24 Hours |
Mold Lead Time | 10~30 Days | |
Sample Lead Time | 3~5 Days | |
Production Time | Usually 10~30 Days | |
Loading Port | Qingdao Port | |
More Parts |
Grommet, sleeve, feet, gasket, wheel, bellow, cap, dust cover, pad, washer, Strip, plug, stopper, grip, seal, bushing, bumper, blocks, and anti vibration mounts etc. |
FAQ